Irrigation and drainage network plan of a cooperative company’s lands called Parto Banavar
Study, design, as well as workshop and superior supervision of bridge and waterway projects between farms, Golestan province
Tangli project has an area of about 5300 hectares
The second phase study of prioritized lands’ drainage at the level of 75,000 hectares
studying and measuring the water resources evaluation network
The first and second phase Studies of irrigation and drainage network design of Gheizler lands, plan appearance at the level of 2300 hectares
Inspection and control of water resources exploitation, and monitoring the blockage of illegal wells were handed over to Mouj Ab Fan Consulting Engineering by Golestan Regional Water Company
A comprehensive plan of irrigation and drainage networks of the border rivers, Iran
National plan for drainage of lands south of Qarasu River at the level of 20,000 hectares
Moujabfan Consulting Engineering was established in 2000, relying on the valuable experiences of experienced engineers. Moreover, prominent and specialized university professors have collaborated with the company to achieve this goal.